Calendar: the view switcher beside the period, Import and Export beside New reminder #861

Closed
opened 2026-10-10 16:01:29 +00:00 by tiagoagueda · 1 comment
Owner

In every view: the Day, Week, Month, Agenda switch moves into the row of the period navigation, aligned to the end; the heading's row keeps an Import / Export group to the left of New reminder.

What exists today

  • The switch is in the heading's row (templates/applications/calendar.html:145-151, nav-link links, Page.switcher); New reminder beside it (:154-156).
  • Download as iCalendar and Import an iCalendar file are a second header row (:161-169), no icons.

What would change

  • Row 1: h1 … [Import | Export] [+ New reminder]. Row 2: [Previous | This … | Next] period … [Day | Week | Month | Agenda].
  • The switch drawn as a button group (#841) or as #842's tabs look; recommended the button group, since it sits among buttons.
  • Import and Export as in #862.

Checked against main at 8c3d03570. From the maintainer's improvements list of 2026-10-07.

In every view: the *Day, Week, Month, Agenda* switch moves into the row of the period navigation, aligned to the end; the heading's row keeps an *Import* / *Export* group to the left of *New reminder*. ## What exists today - The switch is in the heading's row (`templates/applications/calendar.html:145-151`, `nav-link` links, `Page.switcher`); *New reminder* beside it (`:154-156`). - *Download as iCalendar* and *Import an iCalendar file* are a second header row (`:161-169`), no icons. ## What would change - Row 1: `h1` … `[Import | Export]` `[+ New reminder]`. Row 2: `[Previous | This … | Next]` *period* … `[Day | Week | Month | Agenda]`. - The switch drawn as a button group (#841) or as #842's tabs look; recommended the button group, since it sits among buttons. - Import and Export as in #862. Checked against `main` at `8c3d03570`. From the maintainer's improvements list of 2026-10-07.
tiagoagueda added this to the 0.6.0 milestone 2026-10-10 16:01:29 +00:00
Author
Owner

Fixed in 1d83a31c9 on main.

Fixed in 1d83a31c9 on main.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set

Reference
Postulo/postulo#861
No description provided.