Calendar: the Next button draws its chevron before the word; it belongs after it #902
Labels
No labels
accessibility
authentication
breaking change
bug
documentation
enhancement
interface
internationalisation
observability
performance
security
tier
1
tier
2
tier
3
tier/4
No milestone
No project
No assignees
1 participant
Notifications
Due date
No due date set.
Dependencies
No dependencies set
Reference
Postulo/postulo#902
Loading…
Reference in a new issue
No description provided.
Delete branch "%!s()"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
In every calendar view, the Next button of the period group (#858) draws its chevron before the word:
› Next. It should come after it,Next ›, so the arrow points the way the button goes and mirrors‹ Previouson the other side of the group.Where
templates/applications/calendar.html:170:The icon comes first in the markup. Previous (
:168) is right as it is, with the chevron before the word.What to do
{% icon "chevron-right" %}after the label span on the Next button.Next ›is drawn as‹ Nextmirrored, but the chevron glyphs themselves must flip, as the breadcrumb already does withdata-rtl-flip(cotton/crumb.html). Adddata-rtl-flipto both chevrons if they do not flip yet.sr-onlyand the accessible name still comes fromaria-label.Done when
Next ›in a left-to-right language, with the chevron pointing the right way in a right-to-left one.[data-step="next"], the label comes beforesvg[data-icon="chevron-right"].Checked against
mainat75f31208b.Fixed in
361071762.